WinSol is coming out of a hiatus.  The original grand opening of the Living Energy Learning Center (LeLc) was postponed last June for various reasons, and slowly things are congealing again.  We are now set for a 2019 spring opening.  Here's a progress report: (1) For the first time in 5 years, we have vegetable gardens (raised beds) producing again .  With the addition of several kitties, the persistent munchers and pesky rats are retreating to less threatening environs.  We'll see how the kitties fare during winter and the racoons.  so far, so good: lessons learned from previous kitty ventures. (2) The LeLc dome floor is now 95% finished.  We've had to take out a few rough spots and repair some cracks.  The main progress has been along the outside permieter where snow and rain intrusion was next to impossible to stop. So we cut a 2" gap around the perimeter with the chainsaw to allow speedy runoff.  (3) Our re-Focus will be toward the location to deep fo